High Speed Rail (London–West Midlands) Act 2017
- Reference
- 1313
- Date
- 2025-06-27
- Status
- Royal Assent
- Country
- United Kingdom
- Level
- National
- Primary Source
- View original text →
On 25 November 2013 the Government published the High Speed Rail (London-West Midlands) Bill. The Bill confers the powers required to construct phase 1 of the proposed HS2 scheme from London Euston to Birmingham Curzon Street with intermediate stations in West London (Old Oak Common) and at Birmingham Airport. It provides for a connection to the existing rail link to the Channel Tunnel (HS1) but not to Heathrow Airport.
Key areas
- authorisation of necessary works to construct and maintain phase 1 of the HS2 line (powers to carry out these works are conferred on a nominated undertaker (HS2 Ltd.))
- power to acquire land (and limited rights in land) necessary for the works to be carried out
- deeming of planning permission to be granted for the works
- deregulation of works on HS2 (the disapplication of certain powers contained in other legislation)
- railways matters, essentially the application of existing legislation to HS2 and the future regulatory regime for the line
- facilitating works on conventional lines to integrate them with HS2.
This is a Hybrid Bill, meaning that it has elements of both a Public and a Private Bill. The Bill was given a Second Reading, therefore those directly and specially affected by the construction of the route were able to petition in front of a specially-convened Select Committee on the Bill.
Background information: Hybrid Bills
Further information on how hybrid bills are dealt with in Parliament is available on the Parliament website.